Evidence base
Skip Menu
About the Planning Policy Evidence Base
The planning policy evidence base supports the preparation of development plans and other policy documents. A number of studies have been produced, in some cases undertaken with or by other authorities and consultants.
Community infrastructure
Social, sport and open space study (2017)
- Cheltenham & Tewkesbury open space assessment report (pdf, 3.1 MB)
- Cheltenham & Tewkesbury playing pitch strategy assessment report (pdf, 2.9 MB)
- Social, sport & open space toolkit (pdf, 722 KB)
- Tewkesbury open space standards paper (pdf, 845 KB)
- Tewkesbury playing pitch strategy & action plan (pdf, 21 MB)
Employment
Environment
Landscape assessment
- JCS landscape characterisation assessment and sensitivity analysis (pdf, 9.4 MB)
- Landscape and visual sensitivity study – rural service centres & service villages (pdf, 9.4 MB)
- Landscape sensitivity study – Bishops Cleeve addendum (pdf, 2.4 MB)
- Landscape sensitivity study – Tewkesbury & Ashchurch (pdf, 4.7 MB)
- Winchcombe Town landscape and visual sensitivity study (pdf, 2 MB)
- Assessment of Tewkesbury Borough Plan site allocations on the setting of the Cotswold AONB (pdf, 2.39 MB)
Green belt
Green infrastructure
Strategic flood risk assessment: level 1
- Strategic flood risk assessment – level 1 executive summary (pdf, 1 MB)
- Strategic flood risk assessment – level 1 final report (pdf, 6 MB)
- Strategic flood risk assessment – appendix A (pdf, 212 KB)
- Strategic flood risk assessment – appendix B (pdf, 159 KB)
- Strategic flood risk assessment – appendix C (pdf, 2 MB)
- Strategic flood risk assessment – appendix D (pdf, 355 KB)
- Strategic flood risk assessment – appendix E (pdf, 52 KB)
Strategic flood risk assessment: level 2 – Halcrow report (October 2011)
- Strategic flood risk assessment – level 2 executive summary (pdf, 247 KB)
- Strategic flood risk assessment – level 2 final report (pdf, 10 MB)
Strategic flood risk assessment: level 2 – Capita Symonds report (October 2012)
- SFRA Level 2 – additional assessments report (pdf, 455 KB)
- Appendix B – Tewkesbury site assessment T2 land at Ashchurch (pdf, 657 KB)
- Appendix B – Tewkesbury site assessment T3 land south of A46 Ashchurch (pdf, 370 KB)
- Appendix D – Modelling reports T2 & T3 land to the south of A46 Ashchurch (pdf, 1.4 MB)
- Appendix D – Modelling reports T2 land at Ashchurch (pdf, 647 KB)
- Appendix E – Flood hazard maps T2 blockage scenario (pdf, 564 KB)
- Appendix E – Flood hazard maps T2 flood extent (pdf, 592 KB)
- Appendix E – Flood hazard maps T2 flood hazard (pdf, 555 KB)
- Appendix E – Flood hazard maps T2 surface water (pdf, 11.8 MB)
- Appendix E – Flood hazard maps T3 blockage scenario (pdf, 517 KB)
- Appendix E – Flood hazard maps T3 flood extent (pdf, 538 KB)
- Appendix E – Flood hazard maps T3 flood hazard (pdf, 516 KB)
- Appendix E – Flood hazard maps T3 surface water (pdf, 535 KB)
Tewkesbury Borough Plan preferred options strategic flood risk assessment: level 2 – JBA Consulting report (Nov 2017)
* Geo Mapping must be viewed using Adobe Acrobat Reader in order to turn on layers
* Please refer to Environment Agency comments alongside SFRA documents
- TBP preferred options SFRA level 2 assessment (pdf, 3.4 MB)
- Appendix A.1 – Employment site summary tables (pdf, 770 KB)
- Appendix A.2 – Housing site summary tables (pdf, 1 MB)
- Appendix B – 2D modelling technical summary (pdf, 340 KB)
- Appendix B – Site geo mapping (pdf, 6 MB)
- Double blockage – Bishops Cleeve – site 2 – Malvern View BP (pdf, 1 MB)
- Double blockage – Glos Airport (pdf, 2 MB)
- TBP preferred options SFRA level 2 assessment – addendum report, August 2018 (pdf, 591 KB)
- TBP SFRA level 2 assessment – addendum report – Bishops Cleeve July 2019 (pdf, 1.47 MB)
- Environment Agency comments to be read alongside SFRA (pdf, 285 KB)
- Pre-submission TBP – Statement on Wastewater Infrastructure (pdf, 5.03 MB)
Historic environment
Housing
Assessment of land availability
To submit a site for consideration, please see the ALA submission form below for more information.
Assessment of land availability 2018-19
- Assessment of land availability report 2018-19 (pdf, 2.2 MB)
- Appendix A – submitted site proformas (pdf, 8 MB)
- Appendix B – submitted site maps (pdf, 195 MB)
- Appendix C – JCS assessment of land availability proforma (pdf, 260 KB)
- Appendix D – Tewkesbury assessment of land availability proforma (pdf, 256 KB)
- Appendix E – Inform Gloucestershire accessibility score explanation (pdf, 162 KB)
- Maps key for assessment of land availability and brownfield land register (pdf, 65 KB)
- Gypsy traveller and travelling showpeople addendum – appendix B (pdf, 8.7 MB)
- Gypsy traveller and travelling showpeople addendum – main report (pdf, 996 KB)
Brownfield land register
- Brownfield Land Register Submission Form (doc, 126 KB)
- 2021 Brownfield Land Register Report (pdf, 173 KB)
- Tewkesbury brownfield register (csv, 7.5 KB)
- Tewkesbury brownfield register maps (pdf, 6.2KB)
Gypsy, traveller and travelling show people
Housing standards background paper
Joint core strategy settlement audit
- Appendix 2 – access to 10 key services (pdf, 2.2 MB)
- Appendix 3 – access to major employer – public transport (pdf, 2.3 MB)
- Appendix 4 – access to major employer – drive (pdf, 2.3 MB)
- JCS rural area settlement audit, July 2017 (pdf, 776 KB)
Strategic housing market assessment
Local Housing Needs Assessment
Sites
Sustainability appraisal and habitat assessment
- TBP equality and diversity impact assessment screening report, July 2018 (pdf, 764 KB)
- TBP habitat regulations assessment report, August 2018 (pdf, 1.5 MB)
- TBP sustainability appraisal – main report, August 2018 (pdf, 6.4 MB)
- TBP sustainability appraisal – non technical summary, August 2018 (pdf, 192 KB)