Planning Scheme of Delegation
Changes to how planning applications are determined
On 31 October 2026, the National Scheme of Delegation came into effect and changed how planning applications are allocated for decision by planning officers or Planning Committee.
Previously, each council set its own local arrangements for deciding which applications were determined by officers and which were considered by Planning Committee. The scheme introduces a consistent national approach to deciding which planning applications are determined by planning officers and which may be considered by a planning committee.
The national scheme, with local triage arrangements, has been adopted by Tewkesbury Borough Council. The Planning Scheme of Delegation is set out in the Council’s Constitution.
Determining planning applications
Most planning applications are already decided by planning officers, and this will continue under the new arrangements. The national scheme places applications into two schedules, Schedule 1 and Schedule 2.
Applications such as householder developments and many smaller-scale proposals fall within Schedule 1 and will normally be determined by officers using delegated powers.
The presumption is that Schedule 2 applications will also be delegated. Larger, more complex or locally significant proposals may however be considered by planning committee where they trigger national and local triage arrangements and pass the gateway test.
SCHEDULE 1:
Applications that must always be delegated to planning officers
- Householder applications
- Minor residential (less than 10 dwellings on sites below 0.5 hectares)*
- Minor commercial development (less than 1,000 sqm) *
- Reserved matters applications where the host permission is less than 500 dwellings or 50,000 sqm
- Permission in Principle applications
- Prior notifications and prior approvals
- Discharge of conditions
- Non-material minor amendments
- Lawful development certificates
- Modification of obligations linked to permissions of the scale/type listed above
- Biodiversity gain plans
- Certificates of appropriate alternative development
SCHEDULE 2:
Delegated but can be subject to local triage, gateway test and possible planning committee
- Everything not in Schedule 1
- Major residential applications (10 or more dwellings)*
- Major commercial applications (1,000 sqm or more of floorspace)*
- Large outline applications: 500 or more dwellings or 50,000 sqm or more floorspace
- Reserved matters applications where the host permission is greater than 500 dwellings or 50,000 sqm
- Technical Details Consent applications
- Listed building consent and planning applications in schedule 1 that are linked to listed building consents
- Advertisement consent
- Works to trees subject to a Tree Preservation Order
- Variations of permissions under S73(1) where the approved permission was a Schedule 2 application
- Retrospective applications
*including changes of use
What is the Gateway Test?
Where a Schedule 2 application meets the national or local triage criteria, it will proceed to a Gateway Meeting.
The purpose of the gateway process is not to determine whether an application should be approved or refused. Instead, it decides whether the application should be determined by the Planning Committee or under delegated powers by officers.
At the Gateway Meeting the Nominated Officer (the Director of Growth or a Development Manager) and the Nominated Member (the Chair or Vice-Chair of Planning Committee) will consider whether the application meets one or both of the national gateway criteria:
- Raises one or more issues of economic, social or environmental significance to the local area.
- Raises one or more significant planning matters, having regard to the adopted Development Plan and other material planning considerations.
An application will only be referred to Planning Committee where the Nominated Officer and Nominated Member agree that at least one of the gateway criteria is met. Where they agree that no gateway criteria are met, or where agreement cannot be reached, the application will be determined by officers under delegated powers.
Gateway Decisions
Where an application is referred to a Gateway Meeting the decision will be recorded on a Gateway Decision and Assessment Form and published on the electronic planning application file. Applications are available to view online via Public Access by searching the planning application reference number.
To ensure transparency, a summary of gateway decisions will be reported to Planning Committee and the summary table will be updated on a regular basis.
Summary of Gateway Decisions
See our Calendar of Meetings for details of planning committee meetings and minutes. Agendas are published online at least five working days before the committee date.
Supporting documents to include extract from the constitution scheme of dele and guide to public speaking at planning committee